West Campus Point Housing Leak Remediation Project
Specifications
Specifications - March 6, 2009
Working Drawings for units 917 & 918
Title Sheet with Legends for Symbols, Abbreviations, etc.
Architectural
A2.01 1st Floor Plan
A2.01ALT 1st Floor Plan with Alternates
A2.02 2nd Floor Plan
A2.02ALT 2nd Floor Plan with Alternates
A2.03 Roof Plan
A2.03ALT Roof Plan with Trellises
A2.04 Trellises
A3.01 Front & Back Elevations
A3.01ALT Front & Back Elevations with Alternates
A3.02 Courtyard and Sides
A03.02ALT Courtyard and Sides with Alternates
A5.01 Wall Details
A5.02 Window Details
A5.03 Door Details
A5.04 Roof Details
A5.05 Drainage Details
A5.06 Trellis Details
A8.01 Door and Window Schedule
Demolitions
D2.01 1st Floor Demoltion Plan
D2.01ALT 1st Floor with Alternates
D2.02 2nd Floor Demoltion Plan
D2.03 Roof Demoltion Plan
D3.01 Front & Back Demoltion Plan
D3.01ALT Front & Back with Alternates
D3.02 Courtyard and Sides Demolition Plan
D3.02ALT Courtyard and Sides with Alternates
Revised July 1, 2
009
Entry Door Sill
Samples
Samples of window hardware, etc.
Comments
Click here
to submit or view comments.